|
|
How to Lay Sod Five steps to successful sod installation
Step 1- Measuring and OrderingMake a sketch of your lot and then measure the area you wish to sod. Calculate the square feet of sod needed (length in feet x width in feet) then divide by 9 to convert to square yards. If you need help, just call us at (252) 637-5883 or click here for a helpful calculator. Step 2 - Soil PreparationPrepare the lot by grading or raking so that soil slopes away from the foundations and buildings so as to eliminate drainage problems. Tilling to a depth of 4" to 6" smoothing the soil, removing rocks and sticks and roots. Water heavily to see if water puddles in any low spots. If so, add top soil or re-grade to eliminate low spots. Step 3 - Sod InstallationStart laying the sod immediately after delivery. Begin watering sod 30 minutes after installation. Sod is a living plant that requires contact and moisture to survive! In hot weather, protect un-laid sod by placing it in the shade if possible. Begin installing sod along the longest straight line, such as a drive way or a side walk. Butt and push edges and ends against each other tightly, and stretch lightly. Avoid gaps or over laps. Remember sod shrinks when it dries. Stager the joints in each row in a brick like fashion, using a large knife or machete to trim corners, etc. Avoid leaving small strips on the outer edge as they will not retain enough moisture. On slopes, lay the sod across the slope. After installing the sod, roll the entire area with a roller designed for this purpose, to ensure good ground contact and to eliminate the appearance of seams. This gives the smooth professional appearance of newly installed sod. Step 4 - WateringGive your new lawn a good soaking of water within 30 minutes of installation. Water daily, or more often, keeping the sod moist until it is firmly rooted in. About 2 weeks is what you should expect, then deeper, less frequent watering is the ideal. Lift random pieces of sod to ascertain that you are watering enough to wet the soil below the sod. Weather conditions will dictate the amount and frequency of watering. Be certain that your new lawn has enough moisture to survive hot, dry or windy periods. Water areas near buildings more frequently where reflected heat dries the turf. Step 5 - MowingYou will know your sod has rooted in when you notice that it needs to be mowed. Carefully mow as to not displace it. It is important that mowing not be delayed to long. Cut it high the first time, but gradually mowing closer to an eventual height of 1 1/2 inches. |
|